7d 30d This month
10
WOs Created
2
Completed
0%
On Time
1
Overdue Now
36
Parts Made
9h 30m
Hours Logged
3.8
Parts / Hour
4
Sessions
How This Works
Finds consecutive operations on the same WO that were running simultaneously. When OP2 is running while OP1 is still running, OP2's session time includes wait time (starved of parts). Only flags sessions where both ops overlap in time โ€” sequential runs are excluded. Cut efficiency = actual cut time รท overlap duration. Below 85% means OP2 was waiting.
No overlapping bottleneck sessions found in this date range.
Either ops ran sequentially (no problem) or no concurrent sessions were logged.